Infrastructure

FACTORY FACILITIES

  • 5.4 acres of land
  • 40,000 square feet dust free Epoxy floored Shop
  • 35 T crane to lift biggest size transformer easily
  • Main Bay 74 m long X 15 m wide, lean to area 7 m wide
  • Separate winding shop, 56 m X 12 m
  • Autoclave for drying
  • Paint booth to ensure dust free painting

FUTURE EXPANSION

  • Phase II project is to expand and build up capacity to manufacture Transformers up to 50MVA, 132kV Class.

TESTING FACILITIES

Quality control activity is augmented substantially by a well-equipped laboratory and transformer test control desk. A test bay capable of carrying out tests specified in various national / international standards ensures that every transformer is thoroughly tested before it leaves the factory.

We have in-house testing facilities for conducting the following tests:

  • Ratio Test
  • Resistance test
  • Polarity & Phase relation test
  • Load Loss & No Load Loss measurement
  • Excitation current
  • Applied Voltage
  • Induced Voltage
  • Temperature rise
  • Test on transformer oil